Algarve Spends €20 Million Replenishing Sand at Loulé and Portimão Beaches Ahead of the 2026 Bathing Season — Quarteira-Garrão Empreitada Pumps 1.4 Million m³ Across 6.6 km for €14.9M with a 37-Metre Average Widening
APA wrapped roughly €20 million of artificial sand replenishment across the Algarve before the 2026 bathing season — €14.9M and 1.4 million m³ of dredged sand at Quarteira-Garrão in Loulé, plus a €1.5M Vau-Três Castelos redistribution in Portimão.