Portugal news, in English, every morning. Free.

Subscribe

Rail

News

Brisav Sends the RECAPE for Porto-Oiã High-Speed Rail Sections 4 and 5 Out to Public Consultation From 8 June — 15 Working Days on the Participa Portal Test the Gaia Station Move to Vilar do Paraíso and the Twin-Bridge Douro Crossing

Brisav opens public consultation on the Porto-Oiã high-speed rail subsections 4 and 5 via the Participa portal on 8 June, with 15 working days to test APA's December 2025 rejection over the Gaia station relocation to Vilar do Paraíso and the twin-bridge Douro crossing.

News

Assembleia da República Reaches Cross-Bench Consensus on Reopening the Linha do Corgo — 96-Kilometre Régua-Vila Real-Chaves Trás-os-Montes Spine Last Operated in 2009 Heads Back to the Plano Ferroviário Nacional Pipeline

The Comissão de Infraestruturas, Mobilidade e Habitação closed its 7 June hearing on the Linha do Corgo reopening petition with cross-bench support — left wants an accelerated calendar, right wants viability studies first, and each party now files a resolution project for the plenary vote.

Transport

Pitta Ferraz Takes the Chair and Paulo Carmona Steps Into the Infraestruturas de Portugal CEO Seat in May — Mandate Frames the Porto-Lisbon TGV, Porto-Vigo, Lisbon-Madrid Lines and the Third Tagus Crossing

IP opens a new mandate in May with Duarte Pitta Ferraz as chairman and Paulo Carmona stepping out of the DGEG to take the CEO seat — replacing Miguel Cruz after his end-2024 term. Porto-Lisbon TGV, Porto-Vigo, Lisbon-Madrid and the Third Tagus Crossing top the pipeline.