Portugal news in English.

Subscribe

Braga Loses Two Direct Alfa Pendular Trains to Lisbon From Mid-December, for at Least Two Years of Line Works Near Espinho

The 18:00 from Braga and the 14:00 from Lisbon stop running direct while the Northern Line is rebuilt near Espinho, leaving a six-hour gap. The infrastructure minister apologised, and Braga's mayor wants better connections in Porto.

Braga Loses Two Direct Alfa Pendular Trains to Lisbon From Mid-December, for at Least Two Years of Line Works Near Espinho
An Alfa Pendular on the Lisbon to Braga service (file photo, 2010). Photo: Nelso Silva, Wikimedia Commons, CC BY-SA 2.0

Braga will lose two of its daily direct Alfa Pendular trains to and from Lisbon from mid-December, one in each direction, while the Linha do Norte (Northern Line, the Lisbon to Porto main line) is rebuilt near Espinho. The Minister of Infrastructure, Miguel Pinto Luz, apologised to the city on Friday 20 November and said the cut would last at least two years, the Lusa news agency reported in a story carried by Notícias ao Minuto; Observador ran the same account.

Which trains go

  • Braga to Lisbon: the 18:00 departure from Braga.
  • Lisbon to Braga: the 14:00 departure from Lisbon.
  • The gap: the cut leaves a six-hour stretch with no direct long-distance train between the two cities, according to Lusa.
  • From when: Braga City Council, which CP's management briefed this week, gives the start as 13 December; Lusa reported 12 December. On Saturday morning we could not find a notice on CP's own website, so check the timetable before you travel in December.

The rest of Braga's long-distance service stays. "Two trains. So Braga is not isolated," the minister said. "Braga had eight trains and now has six, and temporarily."

Why

Pinto Luz put the cut down to the work on the Northern Line around Espinho, in Aveiro district, and the speed restrictions it brings, which make the full journey impossible for the two trains. The council describes the works as running between Espinho and Aveiro. "We do the works, and many are under way in the north of the country," the minister said. "What we have to do, with humility, is apologise to the people of Braga who will be hurt during this period of work."

What Braga is asking for

According to the council, CP said the reduction is strictly temporary and that the direct services are due to return when the works finish. The mayor, João Rodrigues, said he understood the "inevitable technical constraints", but asked CP to do everything it can to limit the disruption for passengers, in particular through:

  • better conditions for changing trains in Porto;
  • timetables that connect;
  • shorter waiting times.

His requests point to a change of train in Porto for people travelling at those times. "We need works that are well done, finished on time and that bring real improvements to the rail service," Rodrigues said, adding that when they end Braga should have "more connections, better timetables and a more competitive service" than today. The council says it will keep talking to CP and to Infraestruturas de Portugal (IP, the rail infrastructure manager).

Before then, rail travellers across the country face a CP train drivers' strike from 23 to 27 November. More news from the city is in this week's Braga Brief.

Subscribe to The Portugal Brief

Portugal news in English, free by email. Choose your newsletters.

Already subscribed? Sign in