Repaving Starts on the Ponte 25 de Abril Tonight, With Two Lanes Shut in Each Direction on the First Nights
Lusoponte is resurfacing the road deck between 22:00 and 06:00 every night until Friday. The bridge stays open, but on the first nights that leaves a single running lane in each direction.