🇵🇹 Daily Portugal news for expats & investors — FREE Subscribe

Environment

Environmental news, climate policy, and sustainability in Portugal.
APA Reports Brand Beira Baixa's Sophia and Beira Mega-Solar Projects 'Permanent and Irreversible' on the Landscape — €590 Million Sophia Faces a 'Very Significant Reduction', 266 MW Beira Already Rejected, 12,693 Submissions in the Sophia File

APA Reports Brand Beira Baixa's Sophia and Beira Mega-Solar Projects 'Permanent and Irreversible' on the Landscape — €590 Million Sophia Faces a 'Very Significant Reduction', 266 MW Beira Already Rejected, 12,693 Submissions in the Sophia File

APA's 18 May assessments brand Beira Baixa's €590M Sophia and 266 MW Beira solar mega-projects 'permanent and irreversible'. Beira is rejected; Sophia faces a 'very significant reduction'. The Sophia file logged 12,693 submissions and Fundão has rejected the municipal-interest declaration.
The Portugal Brief
Universidade de Coimbra MARE Team Logs Microplastics at Every Mondego and Vouga Sampling Point — Polyethylene and Polypropylene Lead the Single-Use Signature in 'Moderate' Global Band, Seena Sahadevan Calls for Continuous Monitoring

Universidade de Coimbra MARE Team Logs Microplastics at Every Mondego and Vouga Sampling Point — Polyethylene and Polypropylene Lead the Single-Use Signature in 'Moderate' Global Band, Seena Sahadevan Calls for Continuous Monitoring

A Universidade de Coimbra research team operating out of the Centro de Ciências do Mar e do Ambiente (MARE) has logged microplastic contamination at every sampling location investigated across the Mondego and Vouga river basins in central Portugal,...
The Portugal Brief
Caminha Wraps the €150,000 Emergency Moledo Seawall Job Before the Bathing Season — Montenegro Inspects the Paredão on Monday 18 May Ahead of a €4.5 Million October Phase-Two Coastal Defence

Caminha Wraps the €150,000 Emergency Moledo Seawall Job Before the Bathing Season — Montenegro Inspects the Paredão on Monday 18 May Ahead of a €4.5 Million October Phase-Two Coastal Defence

APA closed the €150,000 emergency stabilisation of the Praia de Moledo seawall ahead of the bathing season after winter storms tore stones off the paredão. PM Montenegro tours on 18 May; a €4.5 million phase-two coastal defence for Moledo and Vila Praia de Âncora starts in October.
The Portugal Brief
APA Eases Groundwater-Drilling Ban Across Most Algarve Water Bodies, the Moura-Ficalho Aquifer and the Left Bank of the Tejo-Sado — Faro Plain and Coastal Salt-Intrusion Zones Stay Frozen

APA Eases Groundwater-Drilling Ban Across Most Algarve Water Bodies, the Moura-Ficalho Aquifer and the Left Bank of the Tejo-Sado — Faro Plain and Coastal Salt-Intrusion Zones Stay Frozen

The Agência Portuguesa do Ambiente has partially lifted its moratorium on new groundwater drillings (furos de água) across most of the Algarve, the Moura-Ficalho aquifer and the left bank of the Tejo-Sado basin. The Faro Plain subsystem and coastal salt-intrusion prevention zones stay frozen.
The Portugal Brief