The Beira Baixa Line Comes Back on 20 September, Seven Months After Storm Kristin Slid the Embankment Away
Infraestruturas de Portugal will reopen the stretch between Mouriscas-A and Vila Velha de Rodao, restoring Regional and Intercidades services along all 240 kilometres. The repair cost 3.4 million euros and used 5,500 cubic metres of rockfill on 120 metres of track.