EU Auditors Find 5.5 Billion Euros of Green Recovery Spending Overstated in Seven Countries, but Flag None of Portugal's 2.6 Billion
The European Court of Auditors says about 9.8 percent of the green spending seven countries reported under the recovery fund was overstated. Portugal reported 2,585 million euros; its three sampled energy-efficiency projects are not among the problems.
About 5.5 billion euros of the spending that seven EU countries, Portugal among them, reported as "green" under the post-pandemic recovery fund was overstated, the European Court of Auditors (ECA) estimates in a special report published on Wednesday 25 November. That is 9.8 percent of the green spending the seven countries had declared. The report names no Portuguese project among the problems it found.
The report looks at the green bonds the European Commission sells to raise money for the Recovery and Resilience Facility, the fund behind Portugal's Plano de Recuperação e Resiliência (PRR, the recovery and resilience plan). The money raised through these bonds has to be matched by eligible green spending, and the Commission counts the green spending member states report to back each issue.
Portugal's part
The auditors chose Portugal, with Germany, Greece, Spain, France and Italy, because of the large amounts of green spending they had reported; Poland was added because of how much it planned to report. According to the report's annex, as of 1 August 2025:
- Portugal had a pool of about 7,988 million euros of recovery plan spending eligible for green bond funding;
- it had reported 2,585 million euros of green spending, 32 percent of that pool and the sixth-largest amount of the 27 member states, behind Italy, France, Germany, Greece and Spain;
- the auditors sampled three Portuguese projects, all of them in energy efficiency.
The report does not name the three projects or give their amounts. It lists the eight projects where it found green spending "materially overstated": one in Spain, three in Greece and four in France. A separate gap of 3.4 billion euros, found in 18 of the 38 measures sampled, comes from France, from delayed data updates in Germany, Greece, Italy and Spain, and from cancelled Spanish projects. Portugal is not named in either finding.
What went wrong elsewhere
Of the 60 projects checked, 52 were reported correctly. In the other eight:
- two had received much less recovery money than was reported;
- two had the full 100 percent green weighting applied wrongly, overstating them by 60 percent;
- four did not fully match the climate aim of the measure they were reported under, with overstatements of 24 to 100 percent. One French case was healthcare spending; Greek cases included a hotel renovation and an exhibition centre.
The auditors found no project that broke the rule that recovery spending must "do no significant harm" to the environment. Their main criticism is of the system: "At EU level there are no checks on whether projects that do not meet green criteria are excluded from the member states' green expenditure declarations," the report says, and "the Commission's full reliance on member states' reporting of green expenditure represents a weakness."
The bonds themselves
By the end of 2025 the Commission had issued 78.5 billion euros of these green bonds, 37 percent of its target of 213.6 billion. The auditors found the programme in line with market principles but less demanding than the EU's own green bond standard: about 25 percent of the spending they finance is fully aligned with the EU's classification of sustainable activities, against the 85 percent the standard requires. The extra cost of running the green issues was small, about 0.35 million euros, but so was the saving on interest, estimated at about 0.4 basis points.
What the auditors want
The ECA recommends that the Commission strengthen its checks and remove risky measures from the pool the bonds can pay for, by November 2027; widen the safety margin between the bonds it issues and the green spending reported, by the end of 2026; and report on the costs and benefits of green bonds against ordinary EU bonds, by mid-2028. "We have identified ways to strengthen the existing framework in view of a final issue of these bonds," said Jorg Kristijan Petrovič, the ECA member who led the audit (press release).
In its reply, the Commission accepts the first two recommendations and partly accepts the third, saying it will report on the measurable parts "on a best effort basis". It says it had issued 85.96 billion euros of green bonds by the end of September 2026 and will review its internal guidance, including the size of the margin, by the end of the year.
For Portugal, the findings come as its recovery plan closes: the Commission gave a positive assessment of its final 4.7 billion euro payment request last week, with all 379 milestones met. A Portuguese version of the report is available.